Bathroom Remodel Cost Calculator

Bathroom size
40 sq ft
How far it goes
The layout
What is behind the tile
Your ZIP code

Showing the national average. Enter your ZIP code for local cost estimates.

Low $8,525
Typical $10,400
High $12,900

National average

Where these figures come from
  • Residential remodelers, United States: $38.25/hour, August 2026 (BLS CES CES2023611803)
  • Bathroom fixtures, mid-range: $3,200.00 per bathroom (price recorded October 2026, not index-adjusted)
  • Cement board, waterproofing, rough plumbing and wiring: $14.00 per sq ft of bathroom (price recorded October 2026, not index-adjusted)
  • Ceramic or porcelain tile: $3.00 per sq ft (price recorded October 2026, not index-adjusted)
  • Thinset, grout and backer board: $0.90 per sq ft (price recorded October 2026, not index-adjusted)

Bathroom Remodel costs $8,525 to $12,900 for a typical 40 sq ft job in 2026, against a national benchmark of $10,400. Labor runs 57.2 crew hours at $38.25 an hour. Enter a ZIP code to apply that area's measured wages for this work and its regional price level.

What makes up the price

Labor $3,063 57.2 hours at $38.25/hour, 40% burden, 1.00x regional
Bathroom fixtures, mid-range $3,200 1 bathroom at $3,200.00 each
Cement board, waterproofing, rough plumbing and wiring $560 40 sq ft of bathroom at $14.00 each
Ceramic or porcelain tile $330 110 sq ft at $3.00 each
Thinset, grout and backer board $99 110 sq ft at $0.90 each
Permit, inspections and the dumpster $450
Contractor overhead and profit $2,696 35% applied to the work above
Typical total $10,400 $8,525 to $12,900 depending on contractor

Cost by size

National averages, before any local adjustment. Computed from the same model as the calculator above, so the two always agree.

Bathroom size Sq ft of bathroom Typical Range
25 sq ft 25 $8,675 $7,100 to $10,750
30 sq ft 30 $9,250 $7,575 to $11,475
40 sq ft 40 $10,400 $8,525 to $12,900
55 sq ft 55 $12,125 $9,950 to $15,025
70 sq ft 70 $13,850 $11,350 to $17,175

The refresh is a quarter of the price and often the right answer

Nobody selling a bathroom remodel opens with this, so:

5 by 8 bathroom Per sq ft
Cosmetic refresh $4,225 $106
Full gut, mid-range $10,400 $260
Full gut, high end $17,350 $434

A cosmetic refresh keeps the walls closed and the tub where it is. New toilet, new faucet and vanity top, new light and mirror, new fan, fresh paint, floor tile, and the tub and wall tile either refinished or regrouted. It takes a few days and needs no permit, no waterproofing and no inspection.

A full gut takes everything back to the studs. New rough plumbing, new wiring, a new waterproofed shower, tile to the floor and the surround, a full fixture set. Two to four weeks.

These are different jobs, not two prices for the same one. The refresh is the right answer when the tub is sound, the tile is intact and the layout works — which is a lot of bathrooms. It becomes the wrong answer the moment there is any sign of water behind the tile, because then the walls have to come off whatever you had planned.

Do not move the toilet

This is the single largest avoidable cost on the page.

Keeping all three drains — toilet, sink, shower — where they are means the floor never comes up. Moving the vanity or the shower within the room means re-running their drains, which is real work but contained: 18% more.

Moving the toilet means opening the floor, cutting in a new three-inch drain at a proper fall, finding a vent for it, and getting it inspected. On a concrete slab it means cutting and re-pouring the slab. That is 35% more on the whole job, for a change that looks minor on a floor plan.

It is sometimes worth it — a badly laid out bathroom is badly laid out for thirty years. But it should be a decision made knowing it costs three thousand dollars on a ten thousand dollar job, not a line somebody adds because the drawing looked better.

Budget for what is behind the tile

The most common surprise in a bathroom is a shower pan that has been leaking quietly for years. By the time it shows, the subfloor has gone and sometimes a joist with it.

Signs worth looking for now, before you ask for quotes:

If any of those are present, assume the subfloor at least. Replacing it adds about 12%; framing repairs about 28%.

And regardless: hold back 10 to 15% as a contingency. Not as a guess about this contractor's honesty, but because a bathroom is the room most likely to be hiding something and the one where the walls have to come off to find out. A remodel that comes in on budget with the contingency unspent is a good outcome; one that has no contingency and finds rot turns into an argument.

How this number is built

Worth saying, because remodel pricing is usually a square-foot rate somebody made up.

The labor here is priced from the residential remodelers wage — the Bureau of Labor Statistics classification for exactly this trade — rather than from a plumber's or a tiler's rate. That is the right choice because a remodel is one general contractor coordinating subs and carrying a crew, and a large share of what you pay for is the coordination itself: the sequence, the three inspections, the days when two trades cannot both be in a 40 square foot room.

The materials are the actual list — fixtures, tile, cement board, waterproofing, rough plumbing, wiring, paint, trim — priced from shelf and supply house prices, the same way every other page on this site is.

For a mid-range 40 sq ft gut at $10,400:

Fixtures: toilet, vanity, faucet, valve, tub, glass around $3,200
Tile and setting materials, 110 sq ft around $430
Cement board, waterproofing, rough plumbing and wiring around $560
Labor, about 57 crew hours around $3,065
Permit, inspections and the dumpster around $450
Overhead and margin the balance

One honest caveat. This estimate has a wider real spread than anything else on this site, because a bathroom is a dozen decisions rather than one measurement. A vanity can be $450 or $3,000. Treat the figure as the middle of a sensible range for the grade you picked, not as a quote.

The timeline, and losing the bathroom

What makes it longer than the work: the inspection sequence. Rough plumbing and electrical have to be inspected before the walls close, which means a scheduled visit and often a day lost waiting for it. Then tile, then final. A delay at any inspection stops everything.

What actually goes wrong on the schedule is almost always a decision that had not been made — a tile not chosen, a vanity on a six-week lead time, a glass enclosure that cannot be templated until the tile is in and then takes two weeks to make. Choose everything before demolition starts. All of it. The contractor will ask, and the honest ones will refuse to start until you have.

And plan for the household: if this is the only bathroom, work out where people are washing for three weeks before the work begins rather than during it.

What is worth the money and what is not

Worth it:

Less often worth it:

On resale: a mid-range bathroom remodel recoups roughly 60 to 70% of its cost, and that is one of the better figures in remodeling. A high-end one recoups less in percentage terms. Neither is an investment — a dated bathroom depresses offers out of proportion to its condition, so what you are buying is the removal of an objection.

Questions worth asking

Common questions

How much does a bathroom remodel cost?

Around $10,400 to gut and rebuild a standard 5 by 8 foot bathroom to a mid-range specification, with most jobs that size falling between $8,525 and $12,900 — about $260 per square foot. A cosmetic refresh that keeps the walls closed is around $4,225, and a high-end gut about $17,350. A larger 80 sq ft bathroom at mid-range comes to about $15,000.

Is a cosmetic bathroom refresh worth doing instead of a full remodel?

Often, and it is a quarter of the price — $4,225 against $10,400 on a 5 by 8 bathroom. A refresh keeps the walls closed and the tub where it is: new toilet, faucet, vanity top, light, mirror, fan, paint and floor tile, with the wall tile regrouted or the tub refinished. It takes days rather than weeks and needs no permit or inspection. It is the right answer when the tub is sound, the tile is intact and the layout works — and the wrong answer the moment there is any sign of water behind the tile.

Why does moving the toilet cost so much?

Because it opens the floor. Keeping the drains where they are means the floor never comes up; moving the toilet means cutting in a new three-inch drain at a proper fall, finding a vent for it, and getting it inspected — and on a concrete slab, cutting and re-pouring the slab. That is about 35% on the whole job, so roughly $3,600 on a $10,400 bathroom, for a change that looks minor on a floor plan. Moving just the vanity or shower within the room is about 18%.

How much contingency should I budget for a bathroom remodel?

Ten to fifteen percent, held back separately. Not as a judgment about the contractor, but because a bathroom is the room most likely to be hiding something and the only way to find out is to take the walls off. The usual find is a shower pan that has leaked for years and taken the subfloor with it — about 12% to replace, or 28% if a joist has gone. A remodel that finishes with the contingency unspent is a good outcome; one with no contingency that finds rot becomes an argument.

What are the signs of water damage behind bathroom tile?

A floor that gives underfoot near the shower or toilet. A stain on the ceiling of the room below. Grout that keeps cracking in the same place, which usually means movement under the tile. A toilet that rocks, which means the flange or the subfloor or both. And tile that sounds hollow when you tap it. Any of those and you should assume subfloor work is coming, and say so when you ask for quotes so it is priced rather than discovered.

How long does a bathroom remodel take?

Three to five days for a cosmetic refresh, two to three weeks for a mid-range gut, three to five weeks for a high-end one. What stretches it beyond the work itself is the inspection sequence — rough plumbing and electrical must be signed off before the walls close, and a missed inspection stops everything for a day. The other cause is almost always a decision that had not been made: a tile unchosen, a vanity on a six-week lead time, a glass enclosure that cannot be templated until the tile is in.

Do I need a permit for a bathroom remodel?

For a gut, yes — commonly $250 to $800, because the plumbing and electrical are being altered, with rough and final inspections. A purely cosmetic refresh that changes no plumbing or wiring usually needs none. The contractor should pull the permit rather than you: a homeowner-pulled permit moves the liability for the work onto the homeowner, which is a bad trade for whatever it saves.

What is worth spending extra on in a bathroom?

Waterproofing done properly — a sheet or liquid membrane behind the tile rather than cement board alone, which is the difference between a shower lasting twenty years and rotting the floor in eight, and is invisible the day it finishes. A fan sized for the room and vented outside rather than into the attic. Good valve bodies, because the trim is swappable and the valve inside the wall is not. And blocking for grab bars while the walls are open, which costs almost nothing now and a fortune later.

What is not worth spending extra on?

A tub nobody uses — keep one in a single-bathroom house for resale, but in a house with another tub a bigger shower is what actually gets used. Heated floors in a small bathroom, which are genuinely pleasant and are a comfort purchase rather than value. And a frameless glass enclosure in a bathroom whose walls are not plumb, where making it fit costs more again than the glass.

Does a bathroom remodel add value to a house?

A mid-range remodel recoups roughly 60 to 70% of its cost at resale, which is one of the better figures in remodeling, and a high-end one recoups less in percentage terms. Neither is an investment in the strict sense. What you are really buying is the removal of an objection: a dated bathroom depresses offers out of proportion to what it would cost to fix, so a sound ordinary bathroom is worth more than its contribution to the appraisal suggests.

Why is this estimate a range rather than a price?

Because a bathroom is a dozen decisions rather than one measurement, and this page has a wider genuine spread than anything else on the site. A vanity can be $450 or $3,000 and both are reasonable choices. The figure here is the middle of a sensible range for the grade selected, built from the actual material list and the residential remodeler wage — but it is an estimate for planning, not a quote. Compare real quotes on their allowances rather than their totals.

What are allowances in a remodel quote?

A dollar budget the contractor sets aside for something you have not chosen yet — tile at a certain price per square foot, a vanity at a certain price. They are normal and necessary, and they are also where a quote and an invoice separate: a low total with low allowances will not survive the showroom. So compare competing quotes on the allowances rather than the bottom line, and if one is notably cheaper, that is usually where.

Where these numbers come from

Nothing here is copied from a contractor directory. Labor is priced from what the trades are actually paid, materials from published producer prices, and both are adjusted to your area using federal cost-of-living data.